Stargate · Texas

Stargate
housing, Texas.

Stargate in Texas is two campuses in the Big Country. The first, built by Crusoe for Oracle and OpenAI at Abilene, is finishing. The second—Vantage's Frontier campus thirty-five miles up the road in Shackelford County—is just getting going, with up to 6,500 workers at peak. Abilene ran out of housing on the first one.

Two campuses · one program

  • Full kitchens
  • On-site laundry
  • Truck parking
  • Weekly rates
Aerial view of a data center campus at dawn with finished buildings beside others still in steel
Two campuses Abilene finishing · Frontier ramping

Site board

Stargate

Abilene
≈1.2 GW · 8 buildings · 4M sq ft
Albany (Frontier)
1.4 GW · 10 buildings · to 2029
Crews
~5,000 at Abilene's peak · up to 6,500 at Frontier
Also in Texas
Milam County — SB Energy, 1.2 GW, first building Oct 2026

The job

Two campuses, one housing problem

Also known as Stargate Abilene · Crusoe Abilene · Lancium Clean Campus · Vantage Frontier · Oracle OpenAI data center

The original Stargate site is Crusoe's campus west of Abilene: eight buildings, about four million square feet, roughly 1.2 gigawatts, built in two phases for Oracle and OpenAI. Phase two started in March 2025 and was scheduled to finish by mid-2026; around four of the eight buildings are already operating. At peak the site hosted about 3,000 workers a day, rising toward 5,000.

Abilene—a city of about 100,000 that was already short some 5,600 homes—absorbed roughly 6,000 workers. Rental vacancy fell to 2.5 percent, apartment rents grew second-fastest in the country, and the city approved a 2,300-site RV park at Elmdale to catch up. It isn't finished.

Now the second campus: Vantage's Frontier in Shackelford County, at Highway 604 and Highway 351 near Albany. Twenty-five billion dollars, 1.4 gigawatts, ten buildings, first delivery in the second half of 2026 and construction through 2029, with as many as 6,500 workers at peak. Same labor pool, same roads, same Abilene. That's why our rooms for Stargate crews are in Albany, Breckenridge and Moran rather than in the city.

Where the build is

The schedule, as published.

  1. Jan 2025

    Stargate announced; Abilene named first site

  2. Mar 2025

    Abilene phase two begins (six more buildings)

  3. Aug 2025

    Vantage announces Frontier in Shackelford County

  4. Now

    Abilene finishing · Frontier's first building in build

  5. H2 2026

    First Frontier building delivers

  6. 2029

    Frontier build-out completes

Get first call

Rooms near Stargate open as the job ramps.

Text us your dates and headcount. When a room comes on in Albany, Breckenridge or Moran, you hear first—no deposit, no list to sign up for, just a text thread with a person who knows the job.

Call or text us

(432) 777-3177

Moving a crew? Request a crew quote and we'll block rooms for the roster.

Straight answers

What crews ask about Stargate.

Which Stargate site is hiring now?
Abilene is in its final stretch; the Frontier campus near Albany is ramping and will carry the bigger workforce from here—up to 6,500 at peak, on Vantage's numbers. If you're dispatched to 'Stargate' in Texas without a town, ask which gate.
Is Stargate Abilene the same as Vantage Frontier?
No. Abilene is Crusoe's campus for Oracle and OpenAI. Frontier is Vantage's campus in Shackelford County, thirty-five miles northeast, also part of the Stargate program. Different owners, different gates, same housing squeeze.
What about Stargate in Milam County?
SB Energy's 1.2 GW campus near Rockdale is Central Texas, with its first building due in October 2026. We don't place rooms there yet—text us if you're headed that way and we'll tell you when we do.

Moving a crew?

Seven or seventy—we’ll map the rooms to the job.

Grouped options, project billing, and one place to manage arrivals, extensions, and departures.

Get a crew quote